Snapshot of DBC Heavy Civil Engineering Capabilities

Ditch 81, near Hornersville, MO

Ditch 81, near Hornersville, MO

Project included:

  • environmental protection
  • silt fence
  • stripping
  •  excavation
  • bedding stone
  • rip-rap
  • semi compacted embankment
  • establishment of turf

Bayou Meto Phase II

image1

This project involved:

  • clearing
  • grubbing
  • excavation
  • cofferdams
  • random fill
  • clay liner
  • filter material
  • rip-rap 

Bayou Meto Inlet Channel

The excavation of a channel from the Arkansas River up to Pump Station #1.

Excavation of Channel

  • 4,300 feet long
  •  60-foot flat bottom
  • 20 foot plus-minus in depth with three to one side slopes.

Grand Tower

image2

Project included:

  • stripping
  • excavation
  • slide repairs over  100,000  CuYd

Ramsey Creek Scour Repair

image3

Project included:

  • clearing
  • channel shaping,
  • rip-rap
  • establishment of turf

Ditch 10, Arkansas

image4

Project involves:

  • clearing
  • excavation
  • establishment of turf